Dongzhou International Terminal

National Approved Project





The National Development & Reform Committee had officially granted an approval to the Group to establish a new oil, gas and liquid petrochemical Terminal with a total docking and storage capacity at least 3 times more than XHIT in Pearl River area

Prospective business model and anticipated Net Profit Margin should be similar to XHIT

It is anticipated that new jetty facilities will become operational in
2008, which will make a considerable contribution to the Group

Terminal Facility Comparison


DZIT
XHIT
Area 515,995 sq. meters 211,519 sq. meters
Usable Coastal Line 650 meters 540 meters
Berths 12 Berths
500 ~ 80,000 DWT
5 Berths
500 ~ 30,000 DWT
Capacity 960,950 cbm 330,450 cbm
Tanks 850 - 30,000 cbm 650 - 12,000 cbm
Access Vessel, Barge, Tank Truck, Drum filling, Pipeline Vessel, Barge, Tank Truck
Drum filling
Tank Farm

48 Oil Tanks 750,000 cbm

99 Chemical Tanks 210,950 cbm

25 Oil Tanks 231,000 cbm

61 Chemical Tanks 99,450 cbm

Ownership Hans 92% Hans 92%

 

Terminal Architecture Rendering